- Project Attributes: Manufacture of a Bio Swimming Pool - Pond
Excavation & Pond Landscaping - Pond Lining : Firestone EPDM
- Water Capacity: 200 cubic meters
Aqualife was awarded to supply and install the Firestone EPDM lining in a traditional hotel in Chalkida, Greece. Aqualife was responsible for the excavation and pond landscaping works as well. The pond will be operated as a bio swimming pool for the residents of this hotel. This is the perfect solution for a low cost natural pool. The artificial pond holds approximately 200 cubic meters of fresh water.
Project Workflow
Swimming Pool – Pond Manufacture
Construction of Bio Swimming Pool
Preparing Firestone EPDM lining
Preparing Firestone EPDM lining
Applying Firestone EPDM lining